ElectricMotorcycleForum.com

  • May 22, 2024, 07:45:39 AM
  • Welcome, Guest
Please login or register.

Login with username, password and session length
Advanced search  

News:

Electric Motorcycle Forum is live!

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Messages - Drnknmnky13

Pages: [1]
1
Option 2 is what I was thinking of doing. 7 in series 2 in parallel.

Thanks Proto.

2
I'm in the US.

The voltage is 0. The pack has been dead for about 3 years. It's just been sitting in some guys garage, unplugged, since early 2012.

I just picked the bike up over the weekend.

3
Hello all, I just picked up a 2010 S for basically free. I'm doing the research now to fix the dead battery pack.

I have a quick question. I want to run more leaf modules. Like 11. (20-40 miles is cutting it too close for me) would it be better to run the 4 extra in a series so the amps aren't too high? Or run them in parallel and the system will only take what is needed?

 Thanks folks. I'm very happy to have found this forum. I'm a big fan of alternative transpo. I currently run my 2 diesels on Biodiesel. I have an electric bicycle that gets a lot of use. However it wont do freeway speeds. Which is what I'm hoping to do with the Zero.

4
I just picked up a 2010 Zero S . The battery pack is dead. Do you have any more rebuilt packs?

Thanks

Pages: [1]